Identity of the companies preserved due to non disclosure agreements
Reduced learning curve by 50% using our standard interface for all components (piping, structure and crane) reduced training time.
Reduced inspection planning by 50% using our capability to prioritize compartments to be inspected according to risk simplified planning and increased accuracy.
Corrected inaccurate drawings detecting and eliminating errors as well as producing accurate “as is” model.
Reduced engineering time by 90% using our repair wizard to incorporate the customer’s best practices and policies which were available for all future projects.
Reduced inaccurate estimate of replacement steel from 100% to less than 10% integrating all historical inspection data by modeling the asset in significantly greater detail resulting in much more accurate analysis of asset condition and repair requirements.